Board hears progress on EQ tank; plans to add VFD to smooth peak flows

Sewer Board · December 17, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Board received a technical update on the equalization (EQ) tank project: mechanical work and mixer are installed and the board will add a variable-frequency drive (VFD) to help spread a four-hour evening peak flow and trigger alarms if tank levels rise.

The Chair reported that Mountain Air has completed mechanical work on the EQ tank, including piping, valving, the pump and a mixer. On the controls side the board plans to add a variable-frequency drive so the pump can be dialed between a winter and summer setting to better manage variable flows.

"We're gonna equalize that flow across the treatment basins...the bulk of the flow comes in a 4 hour period from 4PM to 8PM," the Chair said, explaining that the VFD will allow the pump to run at different speeds and trigger alarms if tank levels exceed thresholds. The Chair said the system should significantly reduce peak loading, with final tuning expected after initial operation.