Council reviews sewer-collection rehabilitation bids; engineers recommend base bid only

City of Alcester City Council · January 6, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Banner engineering reported four bids for a sewer collection rehab project; the low responsive bidder was H & W Contracting, but available funding is about $951,000 versus a base bid of roughly $1.072 million, so engineers recommended awarding only the base bid and deferring alternates until televising and final scope are known.

Banner's engineering representative (speaker 9) presented bid results for the sanitary sewer collection system rehabilitation, stating the project received four bids on Dec. 18 and that the low responsive bid came from H & W Contracting of Sioux Falls.

"The base bids range from 1,072,000 roughly up to 1,132,000," the presenter said, and he noted the city's available funding is about $951,000, leaving the base bid approximately $120,000 over available funds. The engineer recommended awarding the base bid only and postponing bid alternates until crews televise the lines and prioritize repairs.

Council discussed options to reduce scope if necessary (for example, eliminating manhole lining or shortening lateral lining lengths) and agreed to wait for televising results and contractor coordination before committing alternates. The engineering report also covered related projects, including a water-tower bid summary and final design steps for the 4th Street water-main work.