Highway staff reported an inventory of roughly 480–500+ culverts, identified several that are failing or undersized and at risk of washout, and estimated about $8,000 for the most urgent repairs while discussing whether replacements should be maintenance or capital projects.

Highway staff (Staff member (Speaker 3) and Highway worker (Speaker 5)) outlined a townwide culvert inventory and described several problem locations where culverts are either flattened, caved in or undersized for runoff. Staff said the town’s inventory lists roughly 480 culverts and that their review indicates ‘‘over 500’’ in practice; several 30-inch culverts on key roads may need attention before spring runoff.

On cost, highway staff estimated immediate localized culvert repairs could run approximately $8,000 for the most critical spots but noted more extensive upgrades (for example increasing a 24-inch pipe to 36 inches) would be capital work and cost substantially more. The board discussed prioritizing the worst sites, balancing possible budget overages against the risk of a washout or flood-related emergency; members asked staff to prepare firm cost estimates and a prioritization for the next budget review.