Summary

City staff presented a bridge inspection that identified three deficiencies — a handrail cable (repaired by county staff), two small roof leaks, and a need for interior and exterior cleaning — and said the county wants to renew the intergovernmental agreement that governs bridge maintenance.

Interim City Administrator Max Baker reviewed an inspection report for the Lowell Covered Bridge and identified three deficiencies: a handrail cable (which county staff has already repaired), two small roof leaks, and a recommendation to clean the bridge interior and exterior. Baker said the county indicated it would arrange further repairs and expressed interest in renewing the intergovernmental agreement (IGA) that covers shared maintenance responsibilities.

Councilor Gail Harris asked why the gate was not included in the structural inspection; Baker clarified the bridge inspection was structural in scope and that gate issues would be handled by an overhead-door or gate contractor. Baker said the expired IGA would not prevent opening the bridge to the public while repairs and IGA renewal discussions proceed.