District engineer reports inlet grate replacements about 80% complete, notes stormwater capacity reached during Tropical Storm Debbie
Summary
Charlie Krebs said the MRI project to replace Pinehurst valley gutter inlet grates is about 80% complete and he will confirm asphalt patch scheduling; he reported parts of the community received almost 8 inches of rain during Tropical Storm Debbie and suggested a drainage connection to E1-A to bypass pipes.
Get email alerts on the Stormwater topic
No spam. Unsubscribe anytime.
District Engineer Charlie Krebs told the board the MRI project to replace Pinehurst valley gutter inlet grates is approximately 80% complete and he will follow up on the schedule for asphalt patching.
Krebs reported that after Tropical Storm Debbie the stormwater system flowed but reached its capacity in places; some parts of the community received nearly 8 inches of rain in two to three days (the roads are designed for 5.5 inches in 24 hours). A resident said standing water was coming up through a slab and causing mold; Mr. Krebs said he does not believe the standing water is the cause because other units did not report similar issues. He suggested The Club could add a drainage connection to E1-A to allow water to bypass pipes and flow directly into the lake.