The Authority's operator reported December 2025 flow of 0.078 million gallons per day, that the plant operated within permit limits, no sludge was hauled, and two grinder-pump call-outs required no repairs.

The Authority’s operator reported that for December 2025 the plant’s average flow was 0.078 million gallons per day and that operations were within permitted discharge limits.

The operator noted there were no sludge hauls in December; two grinder-pump call-outs occurred but required no repairs. Routine maintenance items included snow plowing and pouring sludge drying beds. The operator also confirmed that Form 43 — submitted every three years — was completed and sent to the laboratory.