Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Pcd Shiloh Ranch topic

No spam. Unsubscribe anytime.

Planning commission approves 497.93±-acre 'Shiloh Ranch' PCD for ministry and retreat with conditions

Hall County Planning Commission · February 17, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission approved rezoning of nearly 498 acres for a ministry and retreat center called Shiloh Ranch, limiting new construction to 390,000 sq ft, imposing a 100-foot transitional perimeter buffer, restricting outdoor storage within the buffer, and requiring compliance with Fire Marshal and engineering standards; several residents opposed the commercial zoning and raised traffic, septic, and character concerns.

Tanners Mill Circle, LLC's request to rezone roughly 497.93± acres along Tanners Mill Road, Tanners Mill Circle, Weaver Road and Jones Lane to a Planned Commercial Development for a ministry and retreat center called Shiloh Ranch was approved by the Planning Commission with multiple conditions. Presenters described a campus of day-use facilities, overnight accommodations (staff residences and guest lodging), a single dining hall, supporting amenities and open-air features such as trails and pavilions. The commission's conditions require a 100-foot transitional perimeter buffer (except where adjacent to public right-of-way), limitations on outdoor storage and service areas near the buffer, and a cap of 390,000 square feet for new enclosed construction (excluding existing square footage as of Jan. 1, 2025 and open-air amenities).

Multiple neighbors spoke in opposition, raising concerns about the proposed commercial zoning, potential traffic impacts, impacts to Walnut Creek and other natural resources, septic/sewer arrangements (applicant acknowledged septic systems will be used because sewer is not available), and whether long-term residences would be permitted (applicant said only employees would have long-term housing). The applicant said the Georgia Power easement would not be impacted and that much of the perimeter is planned to remain natural with a 100-foot buffer. The commission voted 4-0 to approve the PCD with the listed conditions (motion by Frank Sosebee; second by Stan Hunt; vote 4-0, Varner absent).