Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Commission signs contract for bridge BROR108(46); MoDOT and Great River Engineering attend pre-construction conference

Vernon County Commission ยท September 17, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A pre-construction conference for bridge BROR108(46) included Great River Engineering, MoDOT and Hartman and Company; the county commission signed a contract with Hartman and Company to begin construction.

The Vernon County Commission participated in a pre-construction conference for bridge BROR108(46) and signed a contract agreement with Hartman and Company, Inc. Representatives from Great River Engineering (Lindsey Chaffin, Zach Olivas, Jake McBee, Lee Schofield) and MoDOT (Josh Dugan) attended the meeting alongside Hartman and Company representatives (Tyson Bahner and Bill Schrock). The minutes record that the contract agreement was signed by the Commissioners and Hartman and Company, authorizing construction activities to proceed.

The conference and contract-signing were recorded in the Sept. 17, 2024 minutes as part of regular project onboarding. The minutes do not include the contract dollar value, start date, or a detailed construction timeline; the presence of MoDOT and engineering staff indicates coordination with state and design partners.