Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Bridge 23876 topic
No spam. Unsubscribe anytime.
Preliminary design for Bridge 23876 at 500 East/225 South approved
Summary
The board approved the preliminary design for Bridge 23876 (500 East/225 South); Forsgren Association's preliminary design report required no separate action after the approval.
Get email alerts on the Bridge 23876 topic
No spam. Unsubscribe anytime.
The Camas County Board of Commissioners reviewed and approved the preliminary design for Bridge 23876, located at 500 East/225 South. Commissioner Colter moved to approve the preliminary design, Commissioner Ralph seconded, and the motion was approved.
The minutes note that Forsgren Association's preliminary design report for the same work required no separate action because the board's approval of the 500 East/225 South agenda item covered it. No vote tally is recorded in the minutes beyond the motion being approved.
