Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Bridge 23876 topic

No spam. Unsubscribe anytime.

Preliminary design for Bridge 23876 at 500 East/225 South approved

Camas County Board of Commissioners ยท October 20, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved the preliminary design for Bridge 23876 (500 East/225 South); Forsgren Association's preliminary design report required no separate action after the approval.

The Camas County Board of Commissioners reviewed and approved the preliminary design for Bridge 23876, located at 500 East/225 South. Commissioner Colter moved to approve the preliminary design, Commissioner Ralph seconded, and the motion was approved.

The minutes note that Forsgren Association's preliminary design report for the same work required no separate action because the board's approval of the 500 East/225 South agenda item covered it. No vote tally is recorded in the minutes beyond the motion being approved.