Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Culvert Repair Installation topic

No spam. Unsubscribe anytime.

Multiple culvert installations and a bridge repair pour reported across precinct

Road & Bridge #3 · July 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Road & Bridge #3 reported culvert installations: a 40‑foot pipe on CR 1541 West Sinton, a 24‑foot concrete pipe by Lakeshore Garden on CR 348 (Mathis), a 40‑foot plastic pipe on Villarreal St (Sinton), and a concrete pour for culvert/bridge repair on CR 502 (St. Paul).

Staff member reported several culvert installations and a concrete repair pour across the precinct. The operations notes list a 40‑foot pipe installation on CR 1541 West Sinton, a 24‑foot concrete pipe installed by Lakeshore Garden on CR 348 in Mathis, and a 40‑foot plastic pipe culvert on Villarreal St in Sinton.

The report also records that the Drainage District and PCT 3 poured concrete for culvert and bridge repair on CR 502 in St. Paul. The notes do not include contractor contact information for all installs or cost and permitting details; those items were marked not specified in the operations entry.