Multiple culvert installations and a bridge repair pour reported across precinct
Summary
Road & Bridge #3 reported culvert installations: a 40‑foot pipe on CR 1541 West Sinton, a 24‑foot concrete pipe by Lakeshore Garden on CR 348 (Mathis), a 40‑foot plastic pipe on Villarreal St (Sinton), and a concrete pour for culvert/bridge repair on CR 502 (St. Paul).
Get email alerts on the Culvert Repair Installation topic
No spam. Unsubscribe anytime.
Staff member reported several culvert installations and a concrete repair pour across the precinct. The operations notes list a 40‑foot pipe installation on CR 1541 West Sinton, a 24‑foot concrete pipe installed by Lakeshore Garden on CR 348 in Mathis, and a 40‑foot plastic pipe culvert on Villarreal St in Sinton.
The report also records that the Drainage District and PCT 3 poured concrete for culvert and bridge repair on CR 502 in St. Paul. The notes do not include contractor contact information for all installs or cost and permitting details; those items were marked not specified in the operations entry.