Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Rezoning topic

No spam. Unsubscribe anytime.

Commission recommends plat and first reading of ordinance to rezone Mayfield manufacturing site with paving, setback conditions

Clark County Board of Commissioners · November 19, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board recommended approval of a 17.17-acre plat (Mayfield Manufacturing Materials Addition) and a rezoning from agricultural to commercial/industrial, conditioning the approval on a 50-foot north setback and paving requirements to connect to Highway 25; Ordinance 1-24 had its first reading and will return for second reading.

The joint Planning Commission and County Commission considered a plat and rezoning request from Mayfield for a 17.17-acre lot to be called Mayfield Manufacturing Materials Addition. Planning staff presented the plat and recommended conditions; the board recommended approval subject to a 50-foot setback on the north side and required that the access road be paved to standards acceptable to the Highway Superintendent and extended to Highway 25.

Commissioner Wallace Knock moved the road and maintenance conditions and Commissioner Chris Sass seconded motions tied to the plat and rezoning. The board also recorded that the property owner would be financially responsible for ensuring that pavement on 185th Street from Highway 25 to the west end of the addition be maintained in a condition similar to 185th Street east of Highway 25. With those conditions, the board recommended rezoning and conducted the first reading of Ordinance 1-24; the second reading and final vote are scheduled at the next meeting.