Planning board approves Saint‑Gobain’s temporary parking lot at 10 Goddard Road with conditions

Town of Northborough Planning Board · July 28, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board granted waivers and approved a temporary asphalt parking and lay‑down area (about 66 spaces) for Saint‑Gobain, subject to a set of conditions including peer‑review revisions, concrete walkways in lieu of stone dust, test pits after clearing and a five‑year limit on the temporary improvements.

The Planning Board voted to close the public hearing and grant the site plan, special permit and associated waivers for a temporary asphalt parking lot and lay‑down area at 10 Goddard Road, submitted by Saint‑Gobain and represented by Veil Environmental Consultants. The board’s planner and the applicant have agreed the temporary design will be updated to address Tetra Tech’s peer‑review comments.

Planner Laurie proposed replacing stone‑dust walkways with 5‑foot wide, 4‑inch thick concrete sidewalks on an 8‑inch gravel base because the temporary lot may remain for up to five years; the applicant said it was amenable to that change. The board included conditions requiring test pits to be completed after clearing but before grading to confirm soil and groundwater separation and a condition that temporary improvements be limited to five years (effective 07/27/2026) unless permanent designs proceed earlier.

The board voted unanimously to grant the waivers (vision‑triangle, comprehensive parking/circulation, lighting, landscaping submission timing) and to approve the site plan and special permits subject to findings and the amended conditions.