Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Infrastructure Wastewater topic
No spam. Unsubscribe anytime.
Selectboard authorizes Dufresne Group for South Village wastewater engineering
Summary
The board unanimously accepted a proposal from the Dufresne Group to provide construction engineering services for the South Village Wastewater extension and authorized the Town Administrator to execute necessary hiring documents.
Get email alerts on the Infrastructure Wastewater topic
No spam. Unsubscribe anytime.
Town Administrator Aileen Tulloch reported that construction for the South Village Wastewater Project begins the following day and recommended executing the engineering contract with the Dufresne Group. The Selectboard unanimously accepted the proposal and authorized Tulloch to sign any documents necessary to engage the contractor.
A related press release referenced in the meeting materials noted a June groundbreaking and that Hunter Excavating was awarded a contract for critical infrastructure funded in part by ARPA; the minutes state the town previously circulated letters to affected residents and posted project information on the town website.
