Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Boathouse Dock topic
No spam. Unsubscribe anytime.
Board approves replacement boathouse and dock at 85 Yacht Club Drive with increased water coverage
Summary
The board approved a plan to replace an existing boathouse and dock at 85 Yacht Club Drive that raises water lot coverage to 20.6% (15% permitted). Applicant professionals said the project removes a pre-existing nonconformity; the board asked for plan clarifications and recommended compliance with township bubbler requirements.
Get email alerts on the Boathouse Dock topic
No spam. Unsubscribe anytime.
At 85 Yacht Club Drive the board approved an application to replace an existing boathouse and dock. Applicant professionals said the project will actually eliminate a pre-existing nonconformity; the requested variances relate to water lot coverage (20.6% proposed vs. 15% permitted) and maximum dock coverage. No height variance was required and the applicant's planner said the project would not impede lake views.
Donna Holmquist, the applicant’s planner, presented aerial exhibits and photographs and said she did not feel the proposed height "will impede any views of the lake by the neighboring property owners." The Board Engineer and planner reviewed items in their report and the board voted to approve the application with the professional recommendations (including removing a cable notation from the plan and considering a bubbler system meeting township ordinance).
