Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Septic Systems topic

No spam. Unsubscribe anytime.

Board approves replacement home at 43 Mason Street with advanced waste-treatment system

Jefferson Township Land Use Board · June 22, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved Jamie Lerma’s proposal for a four-bedroom replacement house on an undersized R-30 lot with an advanced waste treatment system, deed restriction for maintenance, a rain garden, UV disinfection and an alarm; neighbors raised stormwater and well-proximity concerns.

The Jefferson Township Land Use Board voted to approve Jamie Lerma’s application to construct a four-bedroom replacement single-family dwelling at 43 Mason Street on an undersized R-30 lot. The applicant’s engineer said the new house will be supported by an advanced waste treatment system with a deed restriction for maintenance, a reserve septic area, and a rain garden to address concerns raised by the Lake Hopatcong Commission.

Neighbors spoke at the public hearing about existing drainage and the proximity of wells; resident Kenneth Farina raised concerns about stormwater management and potential effects on neighboring wells. Tom Graham, the applicant’s engineer, told the board that after consulting with the health department the provided well information gave confidence in the proposed system. "There will be a UV light installed," Graham said, and he confirmed an alarm will be provided. The board approved the application by recorded vote; the applicant entered two exhibits (Building Height Calculation and Steep Slopes Disturbance) to the record.