Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Public Safety topic

No spam. Unsubscribe anytime.

Fire chief flags water, access and mutual-aid questions amid library construction plans

Kensington Selectboard · July 28, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The fire chief updated the board on equipment and mutual-aid activity and raised concerns about whether the library demolition/expansion plans preserve station access, alarms and water supply; board asked for technical assurances before construction permits proceed.

Fire Chief (S6) provided a multi-part operational update: recent calls (medical and vehicle incidents), near-complete delivery of a new apparatus with a planned ‘push‑in’ ceremony, and activity with mutual aid to neighboring towns. He also reported on the department’s interest in ambulance-billing and noted the department expects to continue evaluating cost models for paramedic and ambulance services.

The chief then detailed concerns about the proposed library construction: how demolition or reconfiguration could remove or alter the building fire-protection system, the risk of blocking apparatus access with construction vehicles, and the need to protect well/water supply for firefighting. The board acknowledged the safety concerns, directed planners to require the project team to consult the fire and police chiefs, and asked that the library provide a written plan showing alarm continuity and water-access arrangements before permits are approved.