Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Facilities Turf topic

No spam. Unsubscribe anytime.

Board approves SVA Architects design, CMAS procurement for Vista turf field funded by Measure S

Hermosa Beach City School District Board of Education · November 14, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved an SVA Architects proposal to design the Tencate turf field at Vista School and adopted a CMAS contract (0423051021) for turf materials and installation; staff said project costs will come from Fund 21 (Measure S) and timing will be clarified at a construction meeting.

Board members approved a proposal from SVA Architects to design a new Tencate turf field at Vista School and adopted a California Multiple Award Schedule (CMAS) contract (0423051021) for procurement of materials and installation.

Miss Montalvo presented the item and said the cost will be paid from Fund 21 (Measure S). The board approved the SVA proposal and the CMAS purchase by voice vote. Staff told the board they will review timeline details at a construction meeting next Monday and that using SVA means the engineering is largely complete; staff suggested work could be substantially underway before winter break and said they will post an update in the Friday briefing. The district identified Valley Precision Grading Inc. in association with the CMAS contract number cited during the meeting.

Board members asked about schedule and logistics; the superintendent said staff would provide a construction update and timeline at the next district briefing. The item passed with an affirmative voice vote.