Downtown 1st & Main flooding fix scoped; $300,000 estimated for redundancy storm drain work

Warrenton City Commission · April 9, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Staff outlined an ongoing emergency repair and a longer-term fix for repeated downtown flooding near Fish Sticks; options include a redundancy storm drain to outfall to another area and a $300,000 construction allowance in the CIP for that work.

Staff described repeated downtown flooding issues around 1st & Main, citing a collapsed corrugated culvert repaired as an emergency and noting the bigger problem is where stormwater outfalls and tide interaction cause backups. Staff said one constructible option is a redundancy storm drain outfalling to a different area; the CIP includes $300,000 to advance a construction solution pending design.

Commissioners asked whether a pump system would be sufficient; staff said high tides limit pump effectiveness at this location. The commission directed staff to advance design options and confirmed the CIP allocation to enable construction if a feasible redundancy solution is developed.