Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Finance topic

No spam. Unsubscribe anytime.

Council approves Cottonwood Creek PID IA-3 cost resolution and authorizes offering memorandum distribution

Hutto City Council ยท March 12, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The council approved a cost-determination resolution and authorized distribution of a preliminary offering memorandum for Cottonwood Creek PID Improvement Area No.3, which is expected to contain about 171 single-family lots, with authorized improvements estimated at ~$4.187M and preliminary assessments near $3.327M.

P3 Works representative Kyle Shappen presented the cost-determination resolution for Cottonwood Creek Public Improvement District, Improvement Area No.3. He said IA-3 is anticipated to contain 171 single-family homes; proposed authorized improvements total about $4,187,000 (roughly $3,528,000 for infrastructure: water, drainage and streets) and preliminary bond-issuance costs near $658,000. Preliminary assessments to be levied on the area were estimated at $3,327,000, which Shappen mapped to approximate per-lot assessment equivalents (about $1,600 for 50-foot lots and $1,900 for 70-foot lots); the PID-equivalent tax rate was cited as roughly 0.395 per $100,000, similar to IA-1 and IA-2.

Council moved and approved Resolution R2026-073 calling the public hearing for assessments (to be held April 2) and then approved Resolution R2026-074 to authorize distribution of the preliminary limited offering memorandum for the special assessment revenue bonds for IA-3. Council asked staff to provide community-benefit-fee details and follow-up information; staff said the PID assessments and ARPA revenue contributed materially to the capital grants reported in the city audit.