Niskayuna Fire District No.2 presents 1,600‑sq‑ft meeting room and 985‑sq‑ft decontamination additions; board seeks photometric and drainage details
Summary
Engineering representative Mike Dusalt presented plans for two building additions at Niskayuna Fire Department No.2 — a 1,600 sq ft meeting/firefighter room and a 985 sq ft decontamination suite — plus expanded parking (35 to 44 spaces), a new generator with a belly tank, and stormwater controls; board requested detailed lighting photometrics, DOT coordination on a crosswalk, and a site visit.
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
The planning board heard a detailed presentation from Mike Dusalt of Engineering Ventures about two proposed additions at Niskayuna Fire Department No.2, 2772 Troy Schenectady Road. Dusalt said the larger addition would add about 1,600 square feet for meeting and firefighter space and a separate 985‑square‑foot decontamination addition, and that parking would expand from 35 to 44 spaces.
Dusalt described stormwater and DOT coordination plans: because much of the site drains to Route 7 infrastructure, the design will include a buried chamber system and a hydrodynamic unit to manage water quality and attenuate post‑development peak flows. He also said the project would install a new generator with a belly tank to fuel department vehicles and would replace deteriorated utility lines to a nearby pavilion. On phasing, Dusalt said they hoped to go to bid in October with construction beginning in the spring.
Board members pressed for more detail on several items before any recommendation: a full photometric analysis to show no light spill onto Warner Road properties, confirmation of exact disturbance acreage (noted in the presentation as "about 0.1 or 0.8 acres"), whether removed sheds required variances, snow-storage plans, and final crosswalk treatment in coordination with the DOT. The board also discussed the purpose of the decontamination room, which Dusalt described as segregated showers and washers to reduce environmental and personnel risk from contaminated gear.
The board recommended a site visit and asked the applicant to return with updated drawings, fixture catalog models for lighting, and a point‑by‑point lighting analysis for neighbors' review.