Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Land Use topic

No spam. Unsubscribe anytime.

Commissioners approve Alpine Vista final plat with open-space dedication and SIA edits

Teller County Board of County Commissioners · January 22, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved the final plat for Alpine Vista filing 1 (29 lots on 61.11 acres in Divide Town Center) after negotiating edits to the subdivision improvement agreement (SIA) that clarify timelines, default procedures and responsibilities for parkland and some infrastructure.

The Teller County Board of County Commissioners on Jan. 22 approved the final plat for Alpine Vista subdivision filing 1, a 61.11-acre project in the Divide Town Center that will create 29 detached single-family lots, a reserved telecommunication lot and roughly 15.84 acres proposed for open space and public parkland. The board’s approval came with conditions and edits to the draft Subdivision Improvement Agreement (SIA).

Applicant Craig Nelson of Thunder Ridge Haven LLC and project engineer Jim Halk (Kimley‑Horn) presented materials showing the plat, proposed open-space tracts, drainage and utility plans, and a draft SIA. Nelson said the development is intended to “help Teller County people — Teller County people helping Teller County people,” and asked the county to accept dedicated parkland and consider the recorded final plat as satisfying a prior PUD condition requiring “reasonable development activity.”

Planning staff supported conditional approval, noting required CDOT and utility coordination and that the parcel includes an existing 95-foot telecommunications tower to remain. The board and applicant negotiated language clarifying: (1) a 90-day window for executing the SIA after conditional approval, (2) that the developer is prohibited from selling lots until infrastructure has “progressed or been constructed to the reasonable satisfaction of the county,” and (3) that the open-space acres (tracks A, E, H, I, J, K and M) be conveyed to the county for park purposes with a right of first refusal for the developer should the county ever sell the land. Commissioners also required that if future phases push total dwelling units above 171, fees‑in‑lieu will apply per county regulations.

A county attorney read the final resolution and the board voted unanimously by roll call to approve the plat as amended. The resolution requires the SIA to be signed within 90 days, conditions building permits on TICWU (Teller County wastewater utility) capacity allocations, and obliges the developer to complete drainage and CDOT-related permits and improvements. The resolution also instructs staff to record the final plat after the developer completes a pending telecom-easement release or within the 90-day submittal window, whichever comes first.

Next steps: the developer and county must finalize and record the SIA and plat within the stated deadlines; building permits will be tied to TICWU allocation and completed infrastructure per the SIA.