Summary

The Select Board approved edits and signed off on RFP language for engineering work on Winhall Hollow Road (including a study near house #457), and discussed culvert replacement required before paving the Stratton Access Road.

Andrea Ameden reviewed detailed edits to the engineering RFP for Winhall Hollow Road and asked that the RFP specify the existing road condition, request tests to confirm that status, extend scope 100 feet beyond the bounds, request recommendations for structure type (bridge or box), and include an Opinion of Probable Cost. She said she would draft a scoring rubric, set a deadline for questions (June 25), and send the changes to Lissa Stark for publication.

Separately, Chair E. Stuart Coleman reported that four culverts on the Stratton Access Road must be addressed before paving; three are serviceable but one needs replacement. The board did not finalize paving RFP documents at the meeting and asked staff to follow up with engineering firms.