Summary

The Select Board unanimously approved Flood Hazard Bylaws revisions that restore a provision requiring hydrologic and hydraulic analyses for bank stabilization and related projects, following staff and state consultation.

The Select Board voted to adopt revised Flood Hazard Bylaws on Feb. 9 after discussion about restoring language on bank stabilization and engineering analyses.

Terry Carter noted that following the Jan. 5 meeting, a provision requiring bank stabilization, channel management and related projects in the floodway to obtain conditional-use approval and hydrologic and hydraulic analyses had been removed from a draft; she and others consulted with Montpelier flood personnel and planning staff and concluded the provision could be restored. The board approved the Flood Hazard Bylaws unanimously, with members indicating the restored language aligns with standard engineering practice and local floodplain management expectations.

Board members agreed the restored provision would require analyses by a registered professional engineer certifying no increase in base flood levels; staff and advisors confirmed the reinstatement after consultation.