Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Alternate Well Study topic

No spam. Unsubscribe anytime.

Board OKs $10,000–$20,000 desktop study to assess alternate well site

Town of Manchester Board of Water Commissioners · May 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board authorized spending between $10,000 and $20,000 for a desktop analysis by hydrogeologist Jeff Hoffer to evaluate potential alternate well locations; the motion passed 2-0 after one commissioner left the meeting.

The Town of Manchester authorized a desktop hydrogeologic analysis, budgeting between $10,000 and $20,000, to investigate whether a viable alternate well location exists. Commissioner Doug Kilburn made the motion; Chair Ivan Beattie seconded and the motion passed 2-0 (Commissioner Mark LaChac had left the meeting at 9:48 a.m.).

Minutes identify the proposed analyst as Jeff Hoffer, described as a hydrogeologist. The study is intended to inform whether pursuing a new well site is feasible before committing to larger expenditures (the minutes referenced a possible planning-level estimate of up to $2,000,000 for an alternate well location). No scope-of-work or contract was included in the minutes; the board approved the spending authority to proceed with a desktop analysis.