Get email alerts on the Town Hall Survey topic
No spam. Unsubscribe anytime.
Select Board approves $7,500 Town Hall survey from Sebago Techniques
Summary
The Select Board voted unanimously to accept Sebago Techniques' $7,500 quote to survey the Town Hall complex and declined the $1,800 subsurface utility option; the motion was made by Winchell and seconded by Walsh.
Get email alerts on the Town Hall Survey topic
No spam. Unsubscribe anytime.
The Select Board reviewed a quote from Sebago Techniques to perform a survey of the Town Hall complex. The quote included a $7,500 fee for the survey and an optional $1,800 subsurface utility location service. After discussion, Winchell moved to accept the $7,500 survey only; Walsh seconded and the motion carried with all board members in favor.
The board discussed the need for subsurface utility locating but decided it was not necessary at this time. The decision commits $7,500 for survey work and will allow the town to proceed with mapping and any required site planning based on the survey deliverables.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
