Highway foreman reports FEMA work nearly finished; equipment quotes and rising salt costs noted

Sutton Select Board · September 26, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Highway Foreman Shane Heath told the Select Board that most FEMA flood repairs are complete with some work remaining on Wheeler Mountain; members reviewed equipment quotes (John Deere and Volvo) and learned salt prices are rising to $97.75 (regular) and $107.25 (treated).

Highway Foreman Shane Heath updated the board that nearly all FEMA-related repairs from recent flooding are complete, with a few remaining tasks on Wheeler Mountain. Crews are preparing for winter operations.

Board members reviewed equipment quotes cited by Shane: a John Deere wheeled excavator at approximately $300,000; a Volvo quote of $228,395; and a John Deere track machine at $241,000. Shane also reported salt prices increasing to $97.75 for regular salt and $107.25 for treated salt per the quote presented. Tim Simpson suggested sending a letter of appreciation to contractors who assisted with flood recovery work.