Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Wetlands topic

No spam. Unsubscribe anytime.

Commission issues Order of Conditions for septic work at 176 Concord Road

Westford Conservation Commission · April 8, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After technical review by Marro Environmental Consulting and discussion of septic sleeving and alarm systems, the Conservation Commission voted 7-0-0 to issue the Order of Conditions for 176 Concord Road; applicants said Board of Health sleeving will use Schedule 40 piping.

Matt Marro of Marro Environmental Consulting and applicant Ali Walter discussed an alternative analysis for siting project components at 176 Concord Road, focusing on a 9-foot section of septic pipe within the wetland buffer. Marro noted the Board of Health-required sleeving would be Schedule 40 piping capable of withstanding vehicle loads; Salem and Marro also discussed the septic system alarm.

Following the technical discussion and no suggested changes to the draft Order of Conditions, Commissioner Marilyn Frank moved to issue the Order of Conditions; Noel Almeida seconded and the motion passed 7-0-0 by roll call. The public hearing was closed.