Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Electrical Work topic

No spam. Unsubscribe anytime.

Selectboard identifies outdoor electrical repairs at LERA ahead of next season

Town of Eden Selectboard · October 21, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

At an Oct. 21 special meeting, the Town of Eden Selectboard inspected LERA and listed electrical tasks for next season, including weatherproof outlet covers for both shelters and replacement of a cracked exterior bathroom light that is collecting moisture.

The Town of Eden Selectboard opened its Oct. 21, 2024 special meeting at 5:07 p.m. at LERA and completed a walkthrough of buildings and grounds. The board recorded a set of electrical repairs the town plans to complete before the next season.

During the walkthrough the board specified that outlets in both shelters and the panel supplying the upper seasonal sites need weatherproof covers, and that the exterior light outside the bathrooms must be replaced because it is cracked and collecting moisture. The board listed these items as priorities to be completed prior to reopening.