Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Public Works topic

No spam. Unsubscribe anytime.

Selectboard requires Griggs Road driveway fixes, approves White Road power-line crossing

Eden Selectboard · September 24, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board directed modifications to a new Griggs Road driveway to meet town specifications, delayed sandblasting of a truck until spring 2025, and approved digging across White Road for a power-line installation with construction to follow Town specs.

The Highway Department told the Selectboard that a newly constructed driveway access on Griggs Road must be modified to comply with town specifications and that the north end of the inlet requires armoring. The board recorded that sandblasting of one town truck will be postponed until spring 2025.

Separately, the board approved a request to dig across White Road to run a power line provided the work meets Town specifications. The motion to approve the White Road crossing was made by Ricky Morin and seconded by Clayton Whittemore; the minutes record the motion as approved. The minutes do not include a roll-call vote or conditions beyond compliance with town construction standards.