Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Library Infrastructure topic

No spam. Unsubscribe anytime.

Fairlee library representatives outline HUD grant opportunity, deadline March 31, 2026

Town of Fairlee Selectboard · January 5, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Local library advocates told the Selectboard about a USDA/HUD rural library infrastructure grant (one award per Vermont county) with awards from $50,000 to $400,000, a March 31, 2026 deadline, and priorities including HVAC replacement, exterior ramp/porch repairs, and an emergency front ramp exit.

Representatives from the Fairlee library — Richard Bibeau, Cyrie Lange, Brook Lewis, and Charlotte Williams — presented a HUD rural library infrastructure grant opportunity to the Selectboard. They said the program awards one grant per county in Vermont, offers between $50,000 and $400,000, and sets a March 31, 2026 application deadline.

The presenters told the board that eligibility requirements include a minimum number of open hours per week, availability of Wi‑Fi, and that a building must be located above a defined flood plain. They identified three priorities for the Fairlee library if awarded funds: replace the HVAC system, replace the outdoor ramp/porch/steps, and add an emergency ramp exit to the front of the building. The Selectboard assigned Berger to contact engineer Jeremy Greeley about the library structural engineering report as a follow-up action.