Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Boardwalk topic

No spam. Unsubscribe anytime.

Engineers present two Library Bay boardwalk concepts; public workshop set for June 23

Joint Beautification/Lake, Parks, and Recreation Committee · June 9, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Vierbicher engineer Brandon Fuller presented two concept plans for Library Bay boardwalks and paths, with committee and public input favoring a mix of materials, gateway treatment, and alternative ADA approaches; design presentations will be included at the June 23 workshop.

Brandon Fuller of Vierbicher presented two concept options for new boardwalks and walkways at Library Bay. Option one locates an ADA switchback on the southern property edge with a boardwalk of wood and asphalt and a brick gateway path. Option two places the ADA switchback on the northern edge, uses an all-wood boardwalk, and specifies a concrete gateway path. The concepts were presented to the Joint Beautification/Lake, Parks, and Recreation Committee on June 9, 2026.

Committee members and members of the public suggested alternatives and refinements: stamped concrete for the gateway, removing the ADA switchback altogether, adding a sidewalk on Lake Drive, stairs from the gateway down to the boardwalk, and using wood between the piers but asphalt on the stretch to the fishing pier. Engineer Flunker told the committees the next step is to present the designs to the public at the June 23 workshop for additional input.