The Board approved two haul-route permits allowing heavy frac-sand loads on county roads (two separate permits with axle and gross-weight terms) subject to pre-inspection and bond, and voted to deny BNSF's request that the county provide traffic control and pavement patching at several railroad crossings.
Get email alerts on the Energy Transportation topic
No spam. Unsubscribe anytime.
Commissioners approved Haul Route Agreement #10025 with ConveyTech LLC to haul frac sand at 8 tons per axle (80,000 lbs gross) on CR7 and Agreement #10125 with Cicada Logistics New Town Terminal to haul by legal weight (105,500 lbs gross) on CR17; both permits are conditional on pre-inspection and payment of a cash bond. The approvals were recorded by unanimous roll call.
Separately, the Board reviewed an AECOM request from Jake Stolarski seeking county help with traffic control and road-surface patching at multiple BNSF crossings. County staff said Road & Bridge did not have capacity; Commissioners approved a letter denying the request.