Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Public Works Operations topic

No spam. Unsubscribe anytime.

Board notes $10,000 savings from moving winter maintenance in-house; equipment maintenance and sander issues flagged

Tinmouth Select Board · February 1, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Board members reported moving winter maintenance for a route from a private contractor to the town road crew saved about $10,000; members also discussed issues with a 1-ton sander and higher-than-expected materials and repair costs.

Members reported a recent operational change: winter maintenance for a specified route (Westin/Winterbourne) was shifted from a private contractor to the town road crew, producing estimated savings of about $10,000.

Committee member (S2) explained the change and attributed part of the savings to using town crews instead of a contractor who had previously increased rates. Separately, members discussed mechanical problems with the 1-ton sander and starter replacement, and raised the high cost of repairs and materials; S2 and others urged setting a maintenance schedule and monitoring the equipment line. Chair (S1) said they hoped the town’s 1-ton sander could be made serviceable and highlighted the importance of consistent maintenance to avoid unexpected high costs.

Next steps: work to keep the sander operational, confirm starter status and repair needs with the road commissioner, and maintain a schedule to reduce tire and repair overruns.