Summary

The Town of Winhall solicited proposals to replace two culverts on Winhall Hollow Road (Culverts #25 and #28), specifying expansions, non-perched outlets, riprap bank stabilization and contractor responsibility for permitting; one-day to multi-day closures were noted.

The Town of Winhall on April 10 released an RFP for two culvert replacements on Winhall Hollow Road. Exhibit B describes Culvert #25 (current ~18" CMP, approximately 80 ft long) to be replaced by a 24-inch diameter polypropylene dual-wall storm pipe with an approximate length of 80–100 feet; the new structure must match upstream and downstream slope, avoid a perched outlet, and include riprap and stone headers to stabilize banks. The RFP notes one-day closures or short-duration closures may be necessary and that contractors must provide traffic control and signage with a 14-day prior warning when required.

Exhibit B also references a larger culvert at nearby coordinates (existing 48" x 40') and instructs contractors to follow VTrans hydraulic criteria (Table 6-3) and state/federal permitting requirements or provide written confirmation from Town staff and State agencies that permits are not required. The Town asks for traffic control plans, timelines, fee structures and documentation of experience in proposals due by 1:00 PM on June 1, 2026.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source