Board of Adjustment approves East River Electric transmission line permit with noise follow‑up after resident opposition
Summary
After a public hearing and testimony from East River Electric representatives and a neighboring landowner, the Board of Adjustment approved East River Electric's conditional‑use permit to replace and relocate a transmission line, adding a condition that the company follow up with a resident on noise concerns; vote was 4–1.
Get email alerts on the Utilities topic
No spam. Unsubscribe anytime.
The Board of Adjustment met during the April 15 session to consider East River Electric's request for a conditional‑use permit to operate an electrical transmission line through Richland, Hague and Lake townships. Luke Muller and Jerae Wire presented the project rationale, describing that an existing line would be retired and the replacement would loop the substation from the west and could be converted to a 115 kV line.
Nearby landowner Peggy Nelson spoke in opposition, saying she objected to pole placement and was concerned about losing the county landscape and impacts on property valuation. East River's representative said the route followed an extensive survey and was the preferred option. The board amended the permit to add a condition requiring East River to follow up with Nelson regarding noise control and, after findings of fact, approved the conditional‑use permit on a 4–1 vote (Commissioner Terry Schlagel voted no).