Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Roads And Bridges topic

No spam. Unsubscribe anytime.

Selectboard signs road-salt quote; Knowles Flat pavement and Boy Scout Camp Road gravel still require fixes

Eden Selectboard · November 26, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Selectboard signed the quote for road salt, but pavement damaged by a cable company on Knowles Flat remains unrepaired and gravel replacement beside Boy Scout Camp Road did not meet town specifications; the town will schedule a final engineer site visit before final payment.

Ricky Morin moved and the board approved signing the quote for road salt for the upcoming season. Board members discussed several outstanding repair issues: pavement on Knowles Flat damaged by a cable company has not yet been repaired, and gravel placed where the Boy Scout Camp Road structure was not replaced with crusher-run gravel per Town of Eden specifications.

Selectboard members said a final site visit with the town engineer is needed before issuing full payment to the contractor responsible for the gravel work. The board did not set specific dates for repair completion at the meeting.