Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Town Sign topic
No spam. Unsubscribe anytime.
Selectboard authorizes design review for town sign; will coordinate with school
Summary
After debate about framing and placement, the Stamford Selectboard voted to proceed with a previously discussed town sign design, authorized paying 50% of the design fee up front so the designer can produce artwork, and required the final design return to the board for approval prior to installation.
Get email alerts on the Town Sign topic
No spam. Unsubscribe anytime.
The Selectboard revisited a previously approved town sign project and agreed to proceed with obtaining final artwork and a frame design. Members discussed concerns raised by the school board about mounting and maintenance and emphasized coordination with the principal and school board before installation.
A motion to "move forward with the sign and to install it" was made, seconded and accepted during the meeting. The board agreed to pay approximately 50% of the design fee as a deposit so the designer can prepare proofs, which will be returned to the selectboard for final sign-off before installation. One member emphasized that the designer is "hiring a professional" and the board would check the design for sizing, spelling and compliance before approval.
The board also directed the volunteer lead to coordinate tree trimming and minor landscaping needed for sight lines and to work evenings or off-hours to minimize disruption to school activities. Installation timing will be coordinated with the school principal.

