Board accepts staff plan: owner at 826 Ballinger must file plan and permits; floodway concern noted

Board of Building Standards · May 6, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board accepted staff's recommendation that the owner of 826 Ballinger provide a 30-day plan of action and obtain permits; staff noted the property sits in a floodway and a required engineering form was not submitted, and the board set 60 days for rough inspections after plan approval.

Inspector Ricky Wright presented case 25-006036 (826 Ballinger), saying the property showed incomplete interior renovation after a stop-work order, utilities inactive since Oct. 29, 2024, and hazardous electrical/plumbing. Staff recommended the owner provide a plan of action within 30 days and obtain necessary permits; if submitted, staff recommended 60 days to obtain rough inspections and full final inspections by permit expiration.

During discussion, a staff speaker noted the permit application was not approved originally because the property is in a floodway and an engineering signature/form was not submitted. Board members accepted the staff recommendation; Tankersley moved and Wyatt seconded the motion, which passed on roll call.

The board recorded the order and directed the owner to submit the plan and required engineering paperwork so staff can determine whether demolition or repair is appropriate.