Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Transportation topic

No spam. Unsubscribe anytime.

Board signs road design agreements and approves environmental add-ons for bridge project

Ingham County Board of Commissioners · June 9, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Board authorized engineering design services for Okemos Road repairs, approved an environmental amendment for mussel surveys and possible relocation at the Kinneville Road bridge, and authorized Delhi Township to fund additional sanitary structure work on Aurelius Road.

The Board authorized a $99,500 design agreement with Clark Dietz, Inc. for Okemos Road concrete pavement and joint repairs, with a 20% contingency of $19,900 (Res. #26-290). The project will use Surface Transportation Program funds with an 80/20 cost share and the Road Department is responsible for the local match and project-related costs.

Separately, Res. #26-288 amended DLZ Michigan, Inc.'s agreement for the Kinneville Road over Grand River bridge project to add specialized environmental services: a mussel survey and plan ($13,950), potential relocation services ($26,900 if required) and $5,000 for subcontract coordination — plus a 20% contingency — increasing the amended work authorization by $45,850 (contingency $9,170). The Board also approved an agreement requiring Delhi Charter Township to pay $27,500 (estimated) plus a 20% contingency ($33,000 total) for sanitary structure reconstruction tied to the Aurelius Road resurfacing contract (Res. #26-287).