Board approves Bolton & Menk engineering designs for multiple wetland projects, Burns Prairie design funded by IDALS

Palo Alto County Board of Supervisors · May 26, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board appointed Bolton & Menk to design six wetland sites tied to drainage districts with project fees ranging $60,600–$64,600 and separately approved Burns Prairie wetland design services for $87,500 using IDALS funding.

Jon Rosengren of Bolton & Menk met with the Board and described how constructed wetland sites can improve drainage-district tile function and reduce future maintenance costs.

The Board appointed Bolton & Menk for engineering design on six wetland sites and approved the fee schedule listed in the meeting packet. The recorded project costs were: DD 923 Lat L — $64,600; DD 61 Branch B/Branch B11 — $64,600; DD 83 Main — $60,600; Jt 1 Main, 141 — $64,600; DD 95 Main, Br 1 — $64,600; and Jt. 22 — $60,600. The Board separately appointed Bolton & Menk for Burns Prairie wetland design services for a total cost of $87,500 on a County Conservation project funded through IDALS.

Board members approved the appointments by motion; the meeting minutes note detailed fee breakdowns are on file with the Auditor’s Office. County Conservation was present at the discussion and the Board adopted the motions by unanimous vote.