Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure Bridge Engineering topic

No spam. Unsubscribe anytime.

Cass SWCD approves $11,500 for Cas‑Loon Lake bridge engineering

Cass Soil & Water Conservation District Board · February 11, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Cass Soil & Water Conservation District board on Feb. 11 approved $11,500 from 2025 TSA 8 funds for updated engineering on the Cas‑Loon Lake Bridge (project 97497). The action was approved unanimously by the three members present.

The Cass Soil & Water Conservation District board voted Feb. 11 to approve $11,500 from 2025 TSA 8 funds for updated engineering on the Cas‑Loon Lake Bridge (project 97497, file 11J23). The motion was moved by Katy Botz and seconded by Jennifer O’Neill; roll‑call votes recorded Botz — Aye, O’Neill — Aye and Chair David Peterson — Aye.

The item was listed on the consent/regular agenda as "Updated Engineering For Cas‑Loon Lake Bridge 97497 (11J23) From 2025 TSA 8 Funds." The minutes record the board’s approval but do not include additional directives or a timetable for design work; next procedural steps were not specified in the recorded discussion.