Engineer describes $1.1M plan to upsize lines in Drainage District 82; public hearing held
Summary
The county opened a public hearing on proposed improvements to Drainage District 82 (Laterals 33B and 40B). Engineer Tyler Connolly presented a preliminary design using a 0.75-inch drainage coefficient with an estimated assessable cost of $1,100,000 over 1,081.333 acres; the board later adopted the project as modified and directed the engineer to proceed to bid letting.
Get email alerts on the Drainage Districts topic
No spam. Unsubscribe anytime.
The Kossuth County Board opened a public hearing and heard a detailed engineer's report on proposed improvements to Drainage District 82, focusing on Laterals 33B and 40B. Tyler Connolly, the professional engineer appointed to review the petition, described the design choice of a 0.75-inch drainage coefficient, described pipe-sizing (for example, replacing the lower ~4,600 feet with 42-inch pipe tapering down to 15-inch at the lower end, and Lateral 40B segments of 24- and 15-inch pipe), and presented a preliminary assessable cost estimate of $1,100,000 over 1,081.333 acres. He explained financing options, crop-damage compensation (including payment for two crop losses in disturbed areas), and that upsizing could trigger wetland mitigation requirements that would be the responsibility of affected landowners.
During the hearing clerks read multiple written objections (R. Johnson; Douglas L. and Deborah J. Alks) and a written comment and call from Jerry Perford who said his support was contingent on moving the line to a different alignment. After public comment the hearing was closed and the board moved to adopt the DD82 improvement, directing the engineer to prepare final plans and specifications and to proceed with bid letting. The motion to adopt (moved by Stecker; seconded by Hawes) carried by voice vote.