Summary

Staff outlined CenterPoint's standard lighting package (no upfront hardware cost) and contrasted it with decorative lighting that requires undergrounding and could cost in the high six figures to nearly $1 million; staff said timing is tight if the committee wants to change the design before installation.

Ryan (director of planning and development) briefed the committee on lighting options for the entertainment-district opportunity area, focusing on 13th Street.

He said CenterPoint's standard package uses cobra-head LED fixtures with overhead utilities and carries little up-front installation cost to the city; decorative poles would require underground electrical and more fixtures, increasing both cost and installation time. "That cost was about 1,000,000 dollars," Ryan said, referencing a prior decorative-lighting project on South Broadway and noting that the figure was completed in phases.

Staff emphasized that continuing with the CenterPoint package would allow installation on a relatively short schedule (about six months), but switching to a decorative option would require pausing design and re-budgeting. Committee members asked about funding sources; Ryan identified potential pots (TIRS, hotel-motel occupancy tax) but cautioned those funds are limited. The committee passed a motion to have a representative present the plan to city council and seek consideration for the 13th Street segment.