Get email alerts on the Fairgrounds Infrastructure topic
No spam. Unsubscribe anytime.
Fair Board seeks full cost estimates for racetrack lighting; county asks for pole bids
Summary
Fair Board President Mike Argo presented a Track Signals bid for racetrack lighting; the Board asked him to obtain separate bids from Clay Center Public Utilities for replacement poles and pole-setting so a full cost decision can be made.
Get email alerts on the Fairgrounds Infrastructure topic
No spam. Unsubscribe anytime.
Mike Argo, president of the Fair Board, provided a bid from Track Signals of Minneapolis, Kansas that covered fixtures and the equipment mounted above and on poles for the racetrack lighting.
The Board instructed Mr. Argo to obtain a separate bid from Clay Center Public Utilities for the cost of replacement poles and pole-setting so the Board can review total project costs before making a funding decision.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
