Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the State Funding topic

No spam. Unsubscribe anytime.

HB 460 directs multiple grants to Winn Parish; Port de Luce project stalls after landowner refusal

Police Jury of the Parish of Winn · June 16, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Engineer Henry Shuler outlined items in HB 460 that would fund Winn Parish projects including $975,000 for the fairgrounds pavilion, $500,000 for hookups, $200,000 for infrastructure, and $1,000,000 for Mars Hill Church Road; he said the Port de Luce lake project is no longer feasible after a landowner refused a study and staff are exploring Mosley Drive improvements instead.

Engineer Henry Shuler reviewed provisions in HB No. 460 and related Capital Outlay that affect Winn Parish, listing specific funding amounts he said are allocated to the parish: $975,000 for a fairgrounds pavilion, $500,000 for fairgrounds water/sewer/electric hookups, $200,000 for parish infrastructure/materials/equipment, and $1,000,000 for repairs to Mars Hill Church Road. Shuler said these are 100% grants that require no local match and credited Representative Jack McFarland for securing the funds.

Shuler also said the Port de Luce lake project is effectively dead because a landowner refused access for a study and would not sell; he said staff are proposing to redirect available funds toward Mosley Drive, which floods and may require elevation and a larger bridge, and that Arcadis is modeling hydraulic solutions after a survey currently underway. He noted a separate $3.5 million water-sector merge project (Atlanta and Wheeling) is expected to be bid in about 60 days.