Commission approves rezoning for a nonconforming lot after staff confirms lot-grading requirements

Santa Rosa County Commission (special zoning session) · June 22, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A rezoning request for a nonconforming lot was approved after staff and the applicant’s representative said engineered lot-grading plans and on-site drainage containment would address neighbors’ concerns about flooding; the board followed the zoning-board recommendation and approved without objection.

The commission voted to approve a rezoning request for a nonconforming lot after applicant representation and staff explained flood-control and grading requirements.

Jim Waite, representing the applicant, said the lot was nonconforming but that he had collected neighborhood support signatures. Opponent Dwayne Stevenson urged commissioners to visit the site and warned that additional impervious surface could worsen flooding, saying the property currently pours water onto his land and that he was “very much so against it.” County staff and other board members responded that current county code requires an engineered lot-grading plan for building permits on projects of less than two acres to ensure water is contained on-site. One commissioner said the rezoning was not a setback issue, that drainage standards have been raised, and moved to approve following the zoning-board recommendation; the motion passed without objection.

The approval is subject to standard building-permit requirements, including an engineered lot-grading plan at the time of building permit application.