Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Highway topic

No spam. Unsubscribe anytime.

Selectboard approves overweight permits and weighs Class 4 road logging rules; survey markers planned on Camp Road

Eden Selectboard · February 25, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Selectboard approved overweight permits for four contractors, discussed a Class 4 road logging agreement and timing concerns for Square Road, and reviewed plans from surveyor Matt Reed to place survey markers on Camp Road, noting a site visit and landowner meeting will be required.

The Eden Selectboard approved overweight permits for Dirt Tech Co. LLC, G.W. Tatro Construction Inc., Working Dog Septic Service Inc., and Scott Brown Trucking after Ricky Morin moved and Clayton Whittemore seconded the motion. The approvals were made 'according to town specifications' and no roll-call tallies were recorded in the minutes.

Board members revisited a drafted Class 4 road-use agreement intended for logging and discussed whether warmer temperatures make Square Road unsuitable for skid operations at this stage of the season. Members also considered creating a more generic, reusable agreement for future non-logging uses that require contracts. Surveyor Matt Reed reported he completed a survey of Camp Road and plans to install survey pins; the board reviewed pin styles and costs and said a site visit and meetings with affected landowners are needed before installation. Highway staff also reported they had been pushing back snowbanks to improve sight lines, noted a truck with ongoing issues that will need follow-up service, and confirmed new tires were placed on the grader last week.