NOI approved for demolition and new house at 98 Kibbe Point Rd.; silt fence and waddles required

Town of Otis Conservation Commission · April 21, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Commission granted a Notice of Intent (WE 254-0494) for demolition of an existing house and construction of a new house at 98 Kibbe Point Rd., requiring silt fence and waddles be installed before work begins.

A Notice of Intent (WE 254-0494) submitted by Matthew Puntin of SK Design Group on behalf of David Amanti for demolition of an existing house and construction of a new house at 98 Kibbe Point Rd. (Map 17D Lot 66) was granted by the Commission with special conditions. Chair Domenic Battista moved to grant the NOI with the requirement that a silt fence and waddles be installed prior to the start of work; the motion was seconded and carried unanimously.

The requirement for silt fence and waddles is intended to control sedimentation into the Otis Reservoir during demolition and construction. The project will proceed only after the Commission confirms the erosion-control measures are in place.