Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Site Plan topic

No spam. Unsubscribe anytime.

Commission tables Westmoreland County Food Bank addition, requests setback, parking and stormwater details

Salem Township Planning Commission · November 6, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning Commission tabled the Westmoreland County Food Bank site-plan for an addition and parking, requiring revised setbacks (15' side/rear, 30' front), parking/loading calculations, internal circulation diagrams, and stormwater and erosion approvals before further action.

The Salem Township Planning Commission reviewed a site plan from the Westmoreland County Food Bank for a building addition and parking on parcel 57-12-00-0-087 and deferred action pending additional design details.

Surveyor Dan Irvin was asked to submit a revised site plan that shows a fifteen‑foot side and rear yard setback, a 30‑foot front building setback off Devonshire Road and Cloverleaf Drive, simplified sheets without topographic clutter for clarity, and clear dimensions and area for the existing building and proposed addition. The plan must include off‑street parking and loading calculations required under Section 602 (spaces at least 9 by 20 feet and row width at least 24 feet), labeling and sizing of three proposed loading docks, and an internal circulation plan. Commissioners also required an explicit note stating that township approval does not condone a shed's encroachment onto a neighboring Rimco property. Paul Holleran moved and Connie Mattei seconded tabling the plan; both voted yes.