Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Local Infrastructure topic

No spam. Unsubscribe anytime.

Lakeshore Drive paving complete; water meters repaired and water project set for November review

Village Council · October 10, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Public Works reported Lakeshore Drive paving between Powhatan and Seminole; Treasurer noted $156,000 in the check register for Lakeshore paving and dry wells. Water meters are fully repaired, hydrant flushing will occur in October, and a water project will be ready for Council review in November.

Public Works Director Rick Rietz reported that Lakeshore Drive between Powhatan and Seminole has been paved and that the new surface “looks great.” Treasurer Tracey McCay said the check register includes $156,000 for the Lakeshore Drive paving and installation of dry wells; the check register was approved by motion.

On the water system, Council member Mike Mumper reported the water meter system is now fully repaired and operational. Hydrant flushing will take place in October and residents may notice temporary discoloration; running water briefly should clear it. Mumper said the water project is expected to be ready for Council review on the November agenda.

Council approved the Treasurer’s report and the check register as presented; the minutes do not include additional details on the full scope or vendor for the Lakeshore paving project.